Construction by Neighbourhood

Neighbourhoods are listed in alphabetical order. If your isn't listed, there may be no major, disruptive maintenance projects scheduled. However, you may see City of Red Deer vehicles in your neighbourhood for unexpected or small repair work.

Check the Traffic Disruptions Map to find out more about work underway in your neighbourhood.

Neighbourhood Project Type What to Expect Estimated Date *
Anders
  • Anders Cl - Anders Ave to end
  • Anderson Cl - Ayers Ave to end
  • Allsop Cl/Ave - Allan St to Allsop Cl
Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
Bower
Bennett St - From Gaetz Ave to Barrett Dr Reconstruction of roadway pavement, concrete curb & gutter, and catch basin replacement   June to Sept
Downtown
Gaetz Avenue / Waskasoo Creek Bridge replacement Replacement of existing bridge; rotating road closures.  Learn more on project page. Feb to Oct
Edgar Industrial
  • Edgar Industrial Cl - Taylor Dr to end
Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
Grandview
  • 41a Ave, 40 St,
  • 42 Ave to 44 St
Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure Traffic disruptions and reduced access May-Oct 2026
Mountview
  • 43 Ave - 43 St to 39 St.
Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure Traffic disruptions and reduced access. May-Oct 2026
  • Springbett Dr - 39 St to 37 St
  • 44 Ave Cl - 39 St to end
Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
Riverside Meadows
  • 60 St - 53 Ave to 52 Ave 
Underground utility repair and replacement. Traffic disruptions and reduced access. July-Aug 2026
CPR Bridge Project Rehabilitation of the iconic and historic CPR Pedestrian Bridge spanning the Red Deer Driver Trail closures, no access to the bridge until August 2026. Winter 2025 - Fall 2026
West Park
North of Cronquist Dr. Streetlight Replacement Brief traffic disruptions Summer/Fall 2026

*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.

Major Roadways Project Type What to Expect Estimated Date *
  • 51 Ave & 49 St
  • 51 Ave & 48 St
  • 51 Ave & 47 St
  • 49 Ave & 48 St
  • Oleander Dr. & Taylor Dr.
Traffic signal infrastructure replacement Minor disruptions during traffic signal changeover Spring-Fall 2026
52 Ave & 67 St Water vault replacement Brief traffic disruptions July-Sept 2026

19 St. - Gaetz Ave to Taylor Dr

Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
40 Ave - Waste Management Facility entrance to City Limit Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
Gaetz Ave NB - From Boyce St to 30 St Road rehabilitation - asphalt resurfacing Brief traffic disruptions and reduced access TBD
Taylor Dr - Edgar Industrial Dr to 77 St/Johnstone Dr Micro-surfacing Reduced speeds, alternating lane closures TBD
67 St West - Golden West Av to 65 Ave Micro-surfacing Reduced speeds, alternating lane closures TBD
67 St East - Taylor Dr to Gaetz Ave Micro-surfacing Reduced speeds, alternating lane closures TBD
32 St - 40 Ave to Metcalf Av/Allan St Micro-surfacing Reduced speeds, alternating lane closures TBD

*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.